Labor management in construction is a very aspect that every contractor, construction manager or supervisor needs to fully comprehend. It a very important technique applied by managers in the management of the construction project. A good management project in construction needs to pursue vigorously the efficient labor utilization. Proper labor management promises an availability of labor that is efficient to undertake all construction works and complete on time with no delays of work. Thus cost and time lose will be reduced.
The following are some of the main factors that affect labor management in construction:
1. Labor Productivity
Labor productivity here refers to the amounts of services and goods that a worker produces. For instance, surface finishing, plastering, pouring concrete or bricklaying. Good performing labour normally leads to high productivity. Good performing labor also is a result of proper time and material management. The two elements to look at here is the productivity at the job site and in the construction industry.
Job-Site Productivity: The factors that affect job-site productivity are non-productive activities, project work conditions and labour characteristics.
Non-Productive Activities: The non-productive activities related to a project need to established also in order to determine the productive labor yield. Productive labor yield is the ratio of the direct labor hours dedicated to the completion of the construction project to the potential labor hours. These activities include strikes, non-working days like holidays, absentee time including early quits and late starts, time-off for union operations, temporary stoppage of work as a result of material shortage or inclement weather, the time correcting undesired work and indirect labor needed to have the progress of the project maintained.
Project Work Conditions: Project work conditions involve local climate local cultural characteristics, contractual agreement, equipment utilization, labour availability, job site accessibility and job complexity and size. Also, a set of specific conditions can be utilized to make an estimation of the labor productivity for each construction and craft type.
Labour Characteristics: What is looked at here include the motivation, leadership, experience, skills and the age of the workforce. Servgrow says the performance analysis tool is used to assess the contribution and the quality of the workers. In this analysis, several factors are evaluated including:
The Key to Managing Labor on a Construction Site
Labor management in construction is very key in every construction project. Therefore, it is very imperative that we make decisions to strive for success. The information above will help you in your upcoming construction endeavor.
2. Labour Relations in Construction
Out there, there are union construction organizations. In an attempt to navigate through the unstable economic environment, construction workers have joined labour organizations. These organizations or unions make workers secure because they help limit the effects of ever-varying economic conditions.